Flooding Stops the WashMo Bridge Project

The constant rains in late April halted all construction of the new WashMo bridge. The Missouri went above flood stage on Saturday, April 29th. The construction site on the Warren County side of the river flooded forcing crews to move all of the equipment, site offices and storage buildings out of the flooded river bottom onto the new approach ramp.

Share:

You might also like