Work begins on the approach to the new bridge on the Warren County side of the Missouri. A track hoe moves in to start removing those incredibly tall trees on the north side of the bridge. I wonder how old those trees are? Some of them are taller than the bridge and that has to be over 100 feet.
Tree Clearing Starts
